Name |
Establishment of road map for road 55 Hjulstabron |
Location |
Uppsala county |
Client |
The main client is the Swedish Transport Administration, we work as a UK with VR-Infrapro Henrik Öhrnell Managing Director / CEO +46 (0) 72 213 11 70 henrik.ohrnell@vrinfrapro.se |
Mission time |
Dec. 2016 until today |
Role/Task |
Assignment leader: Cost estimation, LCC analysis and climate calculation, and preparation of the basis calculation according to the successive method. |
Project cost |
ca. 1 200 mnkr |
Mission statement |
Hjulstabron on road 55 crosses the Mälar Trail at Hjulstaviken and is an important crossing over Lake Mälaren. The bridge was built in 1953 and is in need of renovation. Several options are being investigated. Cost estimation and life cycle cost comparison have been made for all possible solutions. |
Experience from the assignment |
Good knowledge of the Swedish Transport Administration’s working methods regarding base calculations and calculation PM. Good experience of calculation work and production planning to ensure the quality of the prepared basis calculations and calculation PM. Plant cost estimates based on the successive method. |
Link to project |
https://www.trafikverket.se/nara-dig/Uppsala/projekt-i-uppsala-lan/vag-55-hjulstabron/ |
Work samples available |
Yes |