Road 263, change of open bridge Erikssund

Description: Establishment of road plans and preparation of tender documents and construction site monitoring of exchange
of movable bridges at Erikssund in Stockholm city”
Client
Trafikverket- Swedish Transport Administration
Broject Budget
~ 120 million SEK
Role
Cost-estimation and LCC-analysis responsible
About Project
The open source bridge on road 263 above Erikssund will be replaced by a new openable bridge. The two existing lanes are widened and the bridge will be completed once and the cycle path for unprotected road users.
The source on road 263 above Håtunaviken at Erikssund is located on the border between Sigtuna Municipality and Upplands-Bro Municipality. The bridge opens for sea traffic approximately 1000 times a year.
Road 263 is operated by 5,500 vehicles per day, of which about 660 are heavy vehicles. The road width of the existing bridge is about six meters and heavy vehicles have difficulty encountering the bridge. Today there is no area reserved for pedestrians or cyclists who must therefore be combined with other vehicle groups.
The source has reached its technical life and needs to be replaced, as there are obvious risks of downtime. The consequence of downtime is queues as well as long diversion routes across Uppsala and Rotebro.
Here you can read and download documents about the project Road 263, change of open bridge Erikssund. All documents are opened in a new window.
Roadmap – consultation
Condition Water activities – consultations